91º»ÏÈÉú

91º»ÏÈÉú Tenders

22 July 2026

Related Information

91º»ÏÈÉú Contract Leads

United Kingdom

Category Goods

Type

No. of Lots 1

Status Active

Published 20th Jul 2026

Tender Details
Referenceocds-h6vhtk-06bf73
Common Procurement VocabularyAir-traffic control simulation
Procurement MethodOpen procedure
Value£2,000,000
« Previous Page

United Kingdom

Category Goods

Type

No. of Lots 1

Status Active

Published 20th Jul 2026

Tender Details
Referenceocds-h6vhtk-06bf73
Common Procurement VocabularyAir-traffic control simulation
Procurement MethodOpen procedure
Value£2,000,000

Changes to notice

This notice has been edited. The previous version is still available.

Tender submission deadline extended to 12:00 midday on 31 July 2026

Scope

Reference

715871499

Description

The requirement is for the provision of 16 x Visual Control Simulators (VISSIM) for training, currency, and assurance for Air Traffic Control Officers (ATCOs) and Air & Space Operations Specialists (ASOS) in the RAF. The requirement is for an Air Traffic Control (ATC) synthetic training environment tool, with ongoing maintenance and software update assistance throughout Contract lifetime. The equipment is to be installed on-site by the Contractor into an office-like environment at all 16 locations.

Total value (estimated)

  • £2,000,000 excluding VAT
  • £2,600,000 including VAT

Above the relevant threshold

Contract dates (estimated)

  • 1 September 2026 to 31 August 2031
  • 5 years

Main procurement category

Goods

CPV classifications

  • 34962210 - Air-traffic control simulation

Contract locations

  • UK - United Kingdom

Participation

Particular suitability

Small and medium-sized enterprises (SME)


Submission

Enquiry deadline

16 July 2026, 12:00pm

Tender submission deadline

31 July 2026, 12:00pm

Submission address and any special instructions

Tenders may be submitted electronically

Yes

Languages that may be used for submission

English

Award decision date (estimated)

14 August 2026


Award criteria

Name Description Type Weighting
7

Demonstrate how your company will simulate the ADC environment at each location, including visual representation from the ATC tower, day/night operations, airfield lighting selections, and inclement...

weather operations, including control over cloud cover, visibility, rain, and fog.

While all technical approaches will be considered, solutions that utilise screen-based display methods are preferred, as they typically better support collaborative training environments and are more comfortable for the user over prolonged periods of time. Alternative solutions (e.g. head-mounted displays) must clearly demonstrate how they achieve comparable performance and comfort against the stated evaluation criteria to attain equivalent scoring.

It is desirable that the POV location can be easily repositioned by the trainer within the simulation to provide alternative views of the environment.

Example images of previous or mock-up simulated environments may be included to support this criterion, in accordance with ITT Section C.

Quality 20%
8

Detail how your company will simulate/replicate the broader controlling environment peripherals, including:

• A communications panel enabling the controller to call other controlling positions (the...

pseudo pilot), manage frequencies and transmit to the pseudo pilot.

• A generic top-down radar display which provides an accurate radar image of all aircraft within the simulation to provide the controller with situational awareness and to aid sequencing.

• An airfield information management display which includes key data for the simulation such as runway in use, weather data, pressure settings, flying schedule and wind speed/direction.

• An airfield lighting panel. This may be integrated into the airfield information display above.

These systems should display information from the synthetic environment where appropriate, e.g. the top-down radar display should be a true representation of the simulated environment state; the lighting state within the simulation should match the lighting panel indicators.

Quality 20%
10

Detail how your company will enable full access to an exercise customisation environment, including how RAF operators can create, edit, and delete exercises without incurring cost. Include detail of...

the process by which ATC procedures, aircraft pathing and vehicle pathing are built within the software. Images of the procedure build process may be included to support this criterion, in accordance with ITT Section C.

Quality 10%
12

Demonstrate how your company will ensure the system accommodates three simultaneous users (trainer, trainee, pseudo-pilot), how the layout supports interaction, and that it can fit within two office...

desk spaces. Images or diagrams showing the 3-user hardware configuration may be included to support this criterion, in accordance with ITT Section C.

Quality 10%
13

Detail how your company will provide training to nominated RAF personnel and provide training materials, including format and content, to support enduring training capability. A single example...

training document excerpt may be included to support this criterion, in accordance with ITT Section C.

Quality 10%
16 - Social Value

Make Britain a clean energy superpower: to cut bills, create jobs and deliver security with cheaper, zero-carbon electricity by 2030, accelerating to net zero.

Demonstrate how you will influence staff,...

suppliers, customers and communities through the delivery of the contract to support climate and nature protection and improvement.

Quality 10%
9

Demonstrate how your company will provide a pseudo-pilot position which allows dynamic, real-time scenario control, simulating ATC aerodrome control procedures.

Quality 5%
11

Detail how your company will provide an exercise replay function, including how it supports post-training debriefing and review. All trainee assessment/scoring will be completed independently by the...

trainer however, system data available to support the trainer will demonstrate higher value.

Quality 5%
14

Detail how your company will manage software updates and the promulgation of new exercise data across all delivery locations including how minor change requests required to maintain system...

functionality will be managed within a through life management plan. This must include a description of the physical or other mechanism by which the system will be updated.

Quality 5%
15

Detail how your company will evidence compliance with agreed KPIs and your process for user feedback/continuous improvement.

Quality 5%

Other information

Applicable trade agreements

  • Government Procurement Agreement (GPA)

Conflicts assessment prepared/revised

Yes


Procedure

Procedure type

Open procedure


Contracting authority

Ministry of Defence

  • Public Procurement Organisation Number: PHVX-4316-ZVGZ

Nimrod Building, 3 Site

High Wycombe

HP14 4UE

United Kingdom

Contact name: Stephen Crawley

Email: stephen.crawley104 [at] mod.gov.uk

Website:

Region: UKJ13 - Buckinghamshire CC

Organisation type: Public authority - central government